Seranit Facade Systems Application Process
Project study is conducted at office medium according to the system or Seranit series selected.
- The technical staff and the number of applicators are determined.
- The place where the assembly materials and staff members will be accommodated is fixed.
- Technical equipment and material preparations are made.
| The locations of site buildings and material storehouses are set and the materials are transported. |
The foundations of buildings are laid and the concrete works of floors are started.
The construction of concrete structures of floors and exterior walls is started according to the locations and heights of the buildings.
The rough construction remnants around the buildings with finished exterior walls are removed and the preparations for scaffolding are made.